Table of Contents
Project Delivery Practice Guide (PDPG) 3rd Edition
Table of Contents pages: 1 2 3
- 6.8 The Private Bidding/Proposing Process 307307
- 6.9 The Negotiation Process 308308
- 6.10 Purchasing of Goods by Owner 309309
- 6.10.1 General Considerations for Purchasing of Goods 310310
- 6.10.2 Procurement Documents for Purchasing of Goods 311311
- 6.10.3 Procurement Options for Purchasing Goods 312312
- 6.10.4 Cost Impacts and Concerns with Purchasing for Goods 314314
- 6.10.5 The Role of the Product Representative when Purchasing for Goods 315315
- 6.11 Availability of Procurement Documents 316316
- DOMAIN 6: PRECONSTRUCTION 317317
- DOMAIN 7: CONSTRUCTION 333333
- 8.1 Introduction 334334
- 8.2 Construction as a Team Activity 334334
- 8.3 Construction Schedule 336336
- 8.4 Executing the Work 340340
- 8.4.1 Field Engineering 340340
- 8.4.2 Supervision of Construction 341341
- 8.4.3 Contractor Responsibilities for Supervision of the Work 341341
- 8.4.4 Complying with Contract Documents 341341
- 8.4.5 Coordinating Construction Activities 341341
- 8.4.6 Construction Means and Methods 342342
- 8.4.7 Examination and Verification 342342
- 8.4.8 Preparation 342342
- 8.4.9 Fabrication, Installation, and Application 342342
- 8.4.10 Tolerances 343343
- 8.4.11 Contractor’s Inspections 343343
- 8.4.12 Cleaning and Construction Waste Management 343343
- 8.4.13 Protecting Installed Construction 344344
- 8.4.14 Testing and Inspection 344344
- 8.4.15 Project Site Safety 344344
- 8.4.16 Delivery of Products 345345
- 8.4.17 Progress Schedule Review 345345
- 8.5 Meetings 346346
- 8.6 Submittals 348348
- 8.6.1 Contract Documents 349349
- 8.6.2 Construction Submittals 350350
- 8.6.3 Action Submittals/Informational Submittals 350350
- 8.6.4 Closeout Submittals 351351
- 8.6.5 Maintenance Material Submittals 351351
- 8.6.6 Submittal Preparation 351351
- 8.6.7 Submittal Review 351351
- 8.6.8 Processing Procedures 352352
- 8.6.9 Delegated Design and Engineering as a Part of Submittals 352352
- 8.7 Site Visits and Observations 353353
- 8.8 Quality Assurance and Quality Control 357357
- 8.9 Interpretations and Modifications 359359
- 8.10 Payment 361361
- 8.10.1 Payment Intervals 362362
- 8.10.2 Contractual Responsibilities 362362
- 8.10.3 Measurement 362362
- 8.10.4 Schedule of Values 363363
- 8.10.5 Application for Payment 363363
- 8.10.6 Progress Payment 364364
- 8.10.7 Retainage 364364
- 8.10.8 Withholding Payment 364364
- 8.10.9 Failure to Make Payments 365365
- 8.10.10 Liens 365365
- 8.10.11 Liquidated Damages and Penalty/Bonus 365365
- 8.10.12 Final Payment 365365
- 8.11 Claims andDisputes 366366
- 8.12 Project Closeout 371371
- 8.12.1 Successful Project Closeout 372372
- 8.12.2 Closeout Meeting 372372
- 8.12.3 Commissioning 374374
- 8.12.4 Project Design Team Closeout 374374
- 8.12.5 Closeout Submittals 375375
- 8.12.6 Starting of Systems and Equipment 377377
- 8.12.7 Final Inspection by Authorities Having Jurisdiction 378378
- 8.12.8 Substantial Completion 378378
- 8.12.9 Correction Period and Contractor's Warranty 379379
- 8.12.10 Final Completion 380380
- DOMAIN 8: LIFE CYCLE ACTIVITES 381381
- 9.1 Introduction 382382
- 9.2 The Nature of Facility Management 382382
- 9.3 Roles and Responsibilities of the Facility Manager 383383
- 9.4 Project Planning 384384
- 9.5 Post Occupancy and Operation and Maintenance 386386
- 9.6 Maintaining and Evaluating the Facility 392392
- 9.7 Facilities Financial Management 395395
- 9.8 Decommissioning 396396
- APPENDICES 438438
- APPENDIX A: Comparisons of Standardized General Conditions 440440
- Appendix B: CSI Forms 455455
- Form 1.4A 461461
- Form 1.5A 456456
- Form 1.5B 476476
- Form 1.5C 473473
- Form 2.2B 475475
- Form 2.4A 499499
- Form 2.4B 500500
- Form 2.5A 501501
- Form 6.0A 474474
- Form 7.0A 478478
- Form 7.0B 479479
- Form 8.0A 480480
- Form 9.1A 462462
- Form 9.3A 463463
- Form 9.4A 464464
- Form 9.6B 481481
- Form 9.7B 482482
- Form 9.8A 465465
- Form 12.1A 466466
- Form 12.1B 483483
- Form 12.1C 484484
- Form 12.2A 485485
- Form 13.0B 486486
- Form 13.1A 468468
- Form 13.1B 487487
- Form 13.2A 467467
- Form 13.2B 488488
- Form 13.3A 470470
- Form 13.3B 489489
- Form 13.4A 471471
- Form 13.4B 490490
- Form 13.5B 491491
- Form 13.6A 492492
- Form 13.6B 493493
- Form 13.6C 494494
- Form 13.6D 495495